Custom cabinetry from Foshan. Since 1995.
nicolas1681688@gmail.comPrivacy

A cabinet supplier checklist for overseas buyers.

Turn a visual cabinet idea into a clear, comparable specification. Review the materials, drawings, samples and quotation before you order.

01 / PROCUREMENT CHECKLIST

The construction

Specify cabinet bodies, door fronts, backs, edging and hardware as separate components. For each, record the brand or supplier, series, core, finish and agreed dimensions. A veneer surface does not mean a solid-wood cabinet; PET does not identify the core.

Ask for a component schedule, sample cross-section and the documentation relevant to the exact materials.

02 / PROCUREMENT CHECKLIST

The drawings

Identify the room dimensions, units and approved drawing revision. Record appliance openings, plumbing positions, fillers, plinths and access conditions. Agree who measures, checks and approves the dimensions.

Ask for numbered elevations, a cabinet schedule and a documented change process.

03 / PROCUREMENT CHECKLIST

The approved sample

Confirm the color, sheen, grain direction and surface feel against an identified sample. Natural veneer has variation; discuss what is acceptable and how later orders will be matched.

Record a sample reference, date and the actual materials it represents.

04 / PROCUREMENT CHECKLIST

The quotation

Compare quotations using the same drawings, quantities and material schedule. Separate cabinets, hardware, countertops, appliances, lighting and accessories. Confirm the trade terms, named place and responsibility for freight, customs and installation.

Request an inclusion/exclusion list and project-specific price and timing.

05 / PROCUREMENT CHECKLIST

Delivery & aftercare

Define the start conditions for production, packaging identification and any staged shipment requirements. Agree how damage, missing parts and dimensional issues will be documented and handled.

Confirm component-specific warranty terms, evidence needed and responsibility for replacement shipping and local labor.

This is a procurement framework, not a promise of a fixed lead time, warranty, installation service or certification. Confirm the actual project terms with Kejia.

From your plan to a clear specification.

A practical path for your cabinetry project.

Start your project
01

Share your brief

Room plans, quantities, preferred finishes and destination.

02

Develop the specification

Agree layouts, materials, hardware and the quotation scope.

03

Confirm the details

Approve drawing revisions, samples and production requirements.

04

Coordinate supply

Document packing, delivery and installation responsibilities.

Review the evidence behind a cabinet quotation

A cabinet supplier checklist should connect each claim to the actual product and order. Separate manufacturing information, material documentation, drawings and the commercial scope. Kejia’s buyer knowledge base also highlights packing identification, replacement-part responsibilities and the approval of changes.

Questions before you order

What questions should I ask a cabinet manufacturer before ordering?

Ask what each component is made from, how dimensions and samples are approved, what the quotation includes and who handles delivery and installation. Verify the scope of supporting documents and obtain written terms for defects, replacement parts and changes.

What belongs in a cabinet drawings and sample approval checklist?

Record room dimensions and units, appliance openings, cabinet numbers, drawing revisions and the person approving each change. Link the finish sample, grain direction, sheen and agreed variation to the correct product schedule.